Skip to main content

Issue - meetings

THE PLANS LIST

Meeting: 31/07/2019 - Planning Committee (Item 28)

28 THE PLANS LIST (00-27-48) pdf icon PDF 375 KB

To consider the planning applications contained in the list.

 

Minutes:

The Committee considered the applications in the plans list *. 

 

Note:   *List previously circulated; copy attached to the signed Minutes.

 

(a)       Applications dealt with without debate.

 

In accordance with its agreed procedure the Committee identified those applications contained in the Plans List which could be dealt with without debate.

 

RESOLVED that the following application be determined or otherwise dealt with in accordance with the various recommendations contained in the list namely:

 

(i)            No 3 on the Plans List (19/00306/LBC – Listed Building Consent for the replacement of Upvc windows to timber windows on south elevation – Middle Weeke Farm, Morchard Bishop) be approved subject to conditions as recommended by the Head of Planning, Economy and Regeneration.

(Proposed by the Chairman)

 

b)  No 1 on the Plans List (19/00573/FULL – Variation of conditions 2, 3,5,6,7 and 8 of planning permission 17/00910/FULL to allow substitution plans – 10 Mayfair, Tiverton).

The Area Team Leader outlined the contents of the report by way of presentation highlighting the site location, the access to the site (which was not proposed to be adopted by the Highway Authority), the approved site plan and the proposed alterations to the scheme.  She identified the land to the south, east and west of the site which would form Area B of the Tiverton Eastern Urban Extension and confirmed that there was no access to this land through Mayfair.  Members viewed the access drive plan and the junction onto Mayfair, the proposed elevations of the dwellings and photographs from various aspects of the site. The officer confirmed that there was no proposal for a footpath alongside the access to the site.

 

Responding to questions posed in public question time, she confirmed that the access road would be tarmaced and would be a minimum of 4.1 metres wide.  The applicant was responsible for the construction of the access road and the maintenance would be agreed by the landowner and the house owners, this was not a planning matter.

 

Consideration was given to:

 

·         Possible issues with water run off affecting the bungalow on the access road and the views of the Lead Local Flood Authority

·         The amendments to how sewage would be dealt with

·         The access road being viewed as suitable for adoption by the Highway Authority but that it would remain a private road.

·         The increase and reduction in some of the floor levels of the new dwellings

·         How and why conditions could be varied

·         The views of the objector with regard to the previous layout in the approved application and that pedestrian provision had been within the original plans. Reference was made to the original conditions relating to occupation of the properties.

·         The views of the applicant with regard to him purchasing the land with planning permission and the amendments that he wished to make to the site for bespoke houses of a better quality.  The removal of the attenuation pond and how that would reduce the amount of soil to be removed from the site

·         Whether the access road  ...  view the full minutes text for item 28