Use the below search options at the bottom of the page to find
information regarding recent decisions that have been taken by the
council’s decision making bodies.
Decision Maker: Cabinet
Made at meeting: 12/11/2024 - Cabinet
Decision published: 22/11/2024
Effective from: 12/11/2024
Decision:
The
Chair stated that discussion with regard to the next item, required Cabinet to pass the following
resolution to exclude the press and public having reflected on
Article 12 12.02 (d) (a presumption in favour of openness) of the
Constitution. This decision was required because consideration of
this matter in public would disclose information falling within one
of the descriptions of exempt information in Schedule 12A to the
Local Government Act 1972. The Cabinet decided, in all
circumstances of the case, the public interest in maintaining the
exemption, outweighed the public interest in disclosing the
information.
RESOLVED: That, in accordance with
Part I of Schedule 12A to the Local Government Act 1972, the press
and public be excluded from the meeting for the next item, for the
reason set out below:
Information under paragraph 3 (contains information relating to
the financial or business affairs of any particular person
including the authority holding that information).
(Proposed by the Chair).
Decision Maker: Cabinet
Made at meeting: 12/11/2024 - Cabinet
Decision published: 22/11/2024
Effective from: 12/11/2024
Decision:
The
Cabinet had before it a report * from the Head of Revenues,
Benefits and Leisure on the change to the Leisure Management System
update.
The
Cabinet Member for Service Delivery and Continuous Improvement gave
a verbal update. Following discussion and having returned to open
session, the Chair highlighted the following:
·
The Cabinet had noted the update provided on the
leisure management system, this was following Cabinets approval on
the 4th June, for the digital transformation of the Leisure
Service, a tender process for ‘lot’ (2.0)
commenced.
·
This was an update on the progress of the
project.
·
The Leisure team worked closely with Procurement
throughout.
·
The tender attracted a lot of interest through the
ProContract
portal with over 30 companies initially registering an interest.
Nine companies underwent evaluation and moderation and had now
successfully awarded to the preferred bidder.
Discussion took place regarding:
·
The nine companies that underwent the
evaluation.
RESOLVED that:
The
Leisure Management System update be NOTED.
(Proposed by Cllr S Clist as Chair)
Note: * Report previously circulated
Decision Maker: Cabinet
Made at meeting: 12/11/2024 - Cabinet
Decision published: 22/11/2024
Effective from: 12/11/2024
Decision:
The Cabinet had before it a
report * from the Deputy Chief Executive (S151) Officer on the Car
Parking Spaces at Halberton
The Cabinet Member for Housing,
Assets and Property Services and Deputy Leader outlined the
contents of the report with particular reference to the
following:
- Cabinet to consider the current proposal from Halberton Parish
Council regarding the future arrangements of the 5 car parking
spaces at the Orchard, Halberton.
- The
report demonstrated that the Council worked with and liaised
constructively with its Parish Councils.
Discussion took place
regarding:
- Members were grateful for all the work that had gone into the
current proposal.
- This report was a great example of working and engagement with
Town and Parishes.
RESOLVED that:
The operation of the 5 car
parking spaces at The Orchard, Halberton on a commercial basis as
identified in paragraph 1.2 be AGREED.
(Proposed by the Deputy Leader
as Chair)
Reason for the
decision: As stated in the
report
Note: * Report previously
circulated.
Decision Maker: Cabinet
Made at meeting: 12/11/2024 - Cabinet
Decision published: 22/11/2024
Effective from: 12/11/2024
Decision:
The Cabinet had before it a
report * from the Deputy Chief Executive (S151) presenting the Tax
Base Calculations.
The Cabinet Member for
Governance, Finance and Risk outlined the contents of the report
with particular reference to the following:
- Each year the Council
had to set the Council Tax base on which it and all precepting
authorities calculated the precept. Within the calculations were
the actual number of properties in the district, the reduction due
to the Council Tax Reduction Scheme.
- The forecast growth
in properties and the likely level of collection – all of
which were converted into an Average Band D property.
- For 2025/26, the
Council projected there would be 30,732.91 Band D properties, which
was healthy growth of 510.81 on the current year and the Council
expected to collect 97.5% of the precept as in the current
year.
- The additional
funding raised through the second homes premium (c£50k)
approved in February 2024 would be earmarked for additional housing
activity / projects.
RESOLVED
that Cabinet recommend to Council that:
- That the calculation
of the Council’s Tax Base for 2025/26 in accordance with The
Local Authorities (Calculation of Tax Base) (England) Regulations
2012 at 30,732.91 an increase of circa 510.81 Band D equivalent
properties from the previous financial year be APPROVED.
- That the current
collection rate of 97.5% remain the same detailed in Section 2 be
APPROVED.
- The premium charges
in 3.7 & 3.8. The premium element of 3.7 will be used to
support additional housing activity/projects to be NOTED.
(Proposed by Cllr J Buczkowski
and seconded by Cllr D Wulff)
Reason for the decision: As
stated in the report
Note: * Report previously
circulated.
Decision Maker: Cabinet
Made at meeting: 12/11/2024 - Cabinet
Decision published: 22/11/2024
Effective from: 12/11/2024
Decision:
The Cabinet had before it a
report * from the Deputy Chief Executive (S151) presenting the
Quarter 2 Treasury Management Report.
The Cabinet Member for
Governance, Finance and Risk outlined the contents of the report
with particular reference to the following:
- In line with
regulations, the mid-year treasury management report required a
more in-depth and informative report to be presented to the
decision makers about the treasury aspects of the Council’s
finances.
- The continuation of
the current policy and approval of the revised Capital Financing
Requirement (CFR), Operational Boundaries and Authorised limits,
which were included within paragraphs 5.4 and 5.5.
- In summary, good
investment returns had been achieved on the treasury investment due
to the slower than expected fall in increased interest rates.
However, the rates had begun to fall. The greater yield was also
helped by the slippage on the capital programme enabling higher
temporary investments to be made.
- An economic summary
provided by the Council’s Treasury Advisors, (Link Group), a
summary of the deposits at the end of the quarter and the yields
that had been achieved.
- No additional
borrowing had been required and although potentially up to
£6m may be required to be sought from external sources before
the end of the financial year, this was lower than originally
assumed within the 2024/25 budget.
- Based on the lower Q2
forecast, the report recommended a reduction in the Capital
Financing Requirement, leading to a reduction in the Authorised
Limit and Operational Boundary for external borrowing.
RESOLVED
that Cabinet recommend to Council that:
- A continuation of the
current policy outlined at paragraphs 4.0 – 4.5 be AGREED.
- The changes to the
Capital Financing Requirement, Operational Boundaries and
Authorised Limits for the current financial year at paragraphs 5.4
– 5.5 be APPROVED.
(Proposed by Cllr J Buczkowski
and seconded by Cllr S Clist)
Note: *Cllr S Keable left the
meeting at 19:49pm
Reason for the decision: As
stated in the report
Note: * Report previously
circulated.
Decision Maker: Cabinet
Made at meeting: 12/11/2024 - Cabinet
Decision published: 22/11/2024
Effective from: 12/11/2024
Decision:
The Cabinet had before it a
report * from the Deputy Chief Executive (S151) presenting the
Quarter 2 Budget Monitoring Report.
The Cabinet Member for
Governance, Finance and Risk outlined the contents of the report
with particular reference to the following:
- Cabinet were asked to
note that the improved projected Outturn position for the General
Fund was a £398k underspend. This was a significant
improvement on the budget and the financial position compared to
previous years.
- In regards to income,
as outlined in the quarter 1 report, there continued to be areas
where the Council had some large variances from budget, both under
and over.
- This mainly reflected
economic circumstances with Planning and Building Control income,
which was lower than forecast due to the stagnation of the housing
market. However, those were more than offset by areas that were
forecasted to be well ahead of budget in areas such as Waste and
Leisure, where recyclable prices were currently strong and Leisure
Centre membership where numbers had increased.
- Regarding the
expenditure, the key element was the salary budget. There were some
significant variances, with underspends through prudent management
of costs in services such as Finance, Human Resources (HR) or
Legal, or overspends in Information and Communications Technology
(ICT) or Environmental Enforcement.
- Although projected to
be significantly lower than previous years, the requirement for
agency staff was higher than expected. Areas of particular pressure
were Waste, Finance, Legal and Planning Enforcement. The main
Service variances were explained in Appendix B, with key income
forecast shown within Appendix C, and staffing variances within
Appendix D.
- The Housing Revenue
Account (HRA) also showed a healthy underspend of £315k. This
was largely due to staff savings and lower interest costs, but was
partially offset by a lower than budgeted investment yield and
increased costs of void properties.
- The capital programme
had been reviewed and a new deliverable Budget for projects
starting in 2024/25 was proposed, The budget was reduced by nearly
£5m, made up of over £3m from projects that were no
longer going ahead; £1.8m from projects that had been delayed
until a future year; £1m from projects reducing in scope;
£0.9m from projects being delivered ahead of schedule; and
£0.300m from a new project following a successful grant
bid.
- There was a sizable
variance (£14.6m) against that revised 2024/25 deliverable
Budget including £16.5m that would slip into future years,
slightly offset by £2m overspend. There were two main reasons
including movements in the HRA Development Programme and delays in
the Cullompton Town Centre Relief Road which had now reached
confirmation of funding being secured.
- Regarding 3Rivers, an
application had been submitted on 28 August 2024 to Companies House
for the company to be voluntarily struck off, the Council were in
the very final few days before it was fully closed. There had been
no issues.
- Work was in progress
with the conversion of St George’s Court into an over
60’s community through the HRA, with the first properties
included on the tenancy lists and occupation expected before
Christmas. The unsold units at Bampton continued to be marketed and
had recently generated meaningful interest but to date no offers
had been received and would be kept under review.
RESOLVED
that:
- The financial
monitoring information for the income and expenditure for the six
months to 30 September 2024 and the projected outturn position be
NOTED.
- The use of Waivers
for the Procurement of goods and services as included in Section 8
be NOTED.
- The update on the
soft closure of 3 Rivers Developments Ltd be noted.
- The revisions to the
2024/25 Deliverable Capital Programme total be APPROVED.
(Proposed by Cllr J Buczkowski
and seconded by Cllr S Clist)
Reason for the decision: As
stated in the report
Note: * Report previously
circulated.
Decision Maker: Cabinet
Made at meeting: 12/11/2024 - Cabinet
Decision published: 22/11/2024
Effective from: 12/11/2024
Decision:
The Cabinet had before it a
report * from the Director of Place and Economy on the Grand
Western Canal Conservation Area Appraisal and Management
Plan.
The Cabinet Member for Planning
and Economic Regeneration outlined the contents of the report with
particular reference to the following:
- The Grand Western
Canal Conservation Area Appraisal and Management Plan, including
the amendments to the extent of the Grand Western Canal
Conservation Area be formally adopted.
- Sections 69 & 71
of the Planning (Listed Buildings and Conservation Areas) Act 1990
stated that local authorities shall from time to time determine
which parts of their area were areas of special architectural or
historic interest, the character or appearance of which it was
desirable to preserve or enhance.
- The Grand Western
Canal Conservation Area was adopted in 1994, and had not been
subject to a review or had proposals for its preservation and
enhancement published.
- The Council had
prepared the Conservation Area Appraisal and Management Plan in
order to meet the requirements of the Planning (Listed Buildings
and Conservation Areas) Act 1990 and the National Planning Policy
Framework (NPPF), as amended in December 2023.
- This Appraisal &
Management Plan was far superior and much more robust than the
1½ page brevity of the 1994 Report and it now had taken into
account the changes in methodology and best practice.
- A full and
comprehensive public engagement and consultation exercise on the
draft document had taken place. The report included a summary of
the public consultation and the key issues raised. All comments
received were reported in full within Appendix 2, together with the
Council’s response and the changes that had been made to the
Conservation Area appraisal.
- The specific changes
made to the document following the public consultation
included:
Land adjacent to Tidcombe
Hall, Tiverton –
The Council had been made aware that Tidcombe Hall and the land
adjacent was at one time in the same ownership and had contributed
to the layout of the canal. The land adjacent to Tidcombe Hall
therefore had sufficient special interest to justify the retention
in the Conservation Area and this approach was consistent with the
National Planning Policy Framework (NPPF).
Pondground Cottage, Holcombe
Rogus – The Council had been made
aware that Pondground Cottage and the adjacent land had historic
links to the nearby quarries and the canal. It was therefore
proposed to retain this area within the Conservation Area boundary.
This approach was consistent with the NPPF requirement to ensure
that Conservation Areas had sufficient architectural or historic
interest to warrant designation.
Area of woodland known as ‘Snakes
Wood’, Tiverton – The
boundary of the Conservation Area adjacent to Snakes Wood had been
amended to include the canal’s embankment. Residents who were
opposed to the de-designation of the woodland and had raised a
variety of points including ecology, wellbeing and health as
positive attributes for the area. Local planning authorities should
ensure that an area justified designation because of its special
architectural or historic interest. This area of woodland was not
of architectural or historic interest and therefore de-designation
of the area was consistent with the NPPF requirement to ensure that
Conservation Areas had sufficient interest to warrant designation.
This approach was consistent with Section 69 of the Planning
(Listed Buildings and Conservation Areas) Act 1990 and the
NPPF.
The Council recognised the value of the canal for ecology,
informal recreation, and health and well-being for local residents
and visitors and in supporting local businesses. The Council
acknowledged the public appreciation of the values of conservation
including wildlife. The public could be reassured that the Council
had other ways to secure the value of sites like ‘Snakes
Wood’ both within the policies of the Council and the
biodiversity duty on the Council. This was a future task of the
Planning, Environment & Sustainability Policy Development
Group. However, those matters were not relevant to the designation
of the conservation area in terms of its special historic or
architectural interest. Those matters were supported through other
work of the Council as a Local Planning Authority and the promotion
by the Council as a visitor destination, and through Devon County
Council’s management of the canal as a Country Park. Species
and habitats were legally protected. This was also included through
the Wildlife and Countryside Act 1981 and the Conservation of
Habitats and Species Regulations 2017. National planning policy and
policies in the adopted Mid Devon Council Local Plan also sought to
protect and enhance habitats and biodiversity. The canal was a
designated Country Wildlife Site and also a designated Local Nature
Reserve and Country Park.
Snakes Wood was designated as
an area of Ancient Woodland and also a Country Wildlife Site. The
canal and Snakes Wood were protected and managed through these
designations.
A number of letters had been
received following the public consultation and the publication of
the report for this meeting. The Council had acknowledged this as
they drew attention to the ecological value of the canal and Snakes
Wood. The Council had already given careful consideration to this
matter in the responses within Appendix 2 and those letters would
be responded to in due course.
The recommendations included in
the report had been considered and endorsed by the Planning Policy
Advisory Group.
Discussion took place
regarding:
- Members had attended
Parish Council meetings and that Sampford Peverell Parish Council
had took part and visited people in the community in regards to the
consultation.
- The exercise that had
been undertaken in regards to the consultation had been appropriate
and fully consulted with by those affected.
- The Grand Western
Canal Joint Advisory Committee were supportive of the work
undertaken by officers.
- The protection of
Snakes Wood and whether the Council could further protect the
woods.
- The accusation that
had been made to the Council and the perceived lack of openness and
transparency.
- The Process and the
Council’s duty to review conservation areas.
- The consultation and
correspondence that had been received with regards to the Grand
Western Canal.
- The Tidcombe Hall
area and two previous planning applications that had been
refused.
- The concerns about
the conservation area status on the canal and the history of the
canal.
RESOLVED
that Cabinet recommend to Council that:
- The Grand Western
Canal Conservation Area Appraisal and Management Plan (Appendix 1
to this report), including proposed amendments to the extent of the
Grand Western Canal Conservation Area made through Section 69(2) of
the Planning (Listed Buildings and Conservation Areas) Act 1990 (as
amended), and used to assist in the process of determining planning
applications and for implementing management proposals be formally
ADOPTED.
(Proposed by Cllr S Keable and
seconded by Cllr J Buczkowski)
Reason for the decision: As
stated in the report
Note: * Report previously
circulated.
Decision Maker: Cabinet
Made at meeting: 12/11/2024 - Cabinet
Decision published: 22/11/2024
Effective from: 12/11/2024
Decision:
The Cabinet had before it a
report * from the Director of Place and Economy on the Cullompton
Town Centre Relief Road.
The Cabinet Member for Planning
and Economic Regeneration outlined the contents of the report with
particular reference to the following:
- At the Cabinet
Meeting on the 4June 2024, Members received an update on various
strategic transport infrastructure schemes in Cullompton and that,
at that time, the Council were awaiting a decision from Homes
England regarding the possibility of additional funding to ensure
delivery of the Cullompton Town Centre Relief Road. This decision had been deferred as a result of the
general election that subsequently occurred in July
2024.
- In August, Homes
England subsequently confirmed a positive decision by its Board to
make available the full funding needed to deliver this hugely
important scheme.
- This progress was
vastly significant given that the Town Centre Relief Road was of
key importance to improve the amenity of the town centre, tackle
air quality problems and unlock housing in the area. Furthermore,
the vast majority of Cullompton residents were keen to get this
scheme delivered, with 92% of local residents supportive of the
Relief Road proposal when asked earlier in 2024.
- Since that time,
officers had been working hard to continue to progress the
scheme. Proactive and positive steps
had been taken in relation to the relocation of the Cricket Club,
remobilisation of the design team and in making meaningful progress
with Tesco in relation to the purchase of its land required to
deliver the Relief Road. The latter had
recently taken a welcomed and positive step in confirming the sale
(subject to contract) of its land to support delivery of the road.
- Building-on and
continuing this progress, the report provided an update, but also
sought authority to enter into updated agreements with Homes
England and Devon County Council which were necessary in order to
now fully enable delivery of the Relief Road.
- The Homes England
Grant Funding Agreement issued to Mid Devon was set out in a
standard form and was an updated version of the previous
contractual arrangements that were with them for the initial
Housing Infrastructure Grant. Officers,
including the Legal Services Manager, had reviewed the draft
Agreement and would continue in negotiating and discussing specific
matters and wording with Homes England.
- Similarly, the
agreement with Devon County Council was also being updated to
reflect the latest Homes England requirements and to ensure that
the funding could readily be made available to the County Council
to enable delivery of the road within the availability period of
the grant funding. It should be noted that inflation and
contingency had been allowed for within the project cost
estimates/funding envelope and that the Council’s cost
liability would not exceed the funding envelope as set out. As
Delivery Partner, Devon County Council would be responsible for
delivery of the project - including cost, risk and programme.
Updated and strengthened governance arrangements were being put in
place to provide delivery assurance to the Council and to create a
strong platform for delivery of this key infrastructure. Devon
County Council was expected to also take a paper before its Cabinet
in December 2024.
Discussion took place
regarding:
- Was the agreement
with Homes England binding once the Council entered it and could
Homes England withdraw their funding once the agreement had been
signed?
- At what point would
the Relief Road become certain? Was it upon contract signing or at
any other critical decisions point where the project could
fail?
- Were there any
alternative options to Devon County Council as a delivery partner
in terms of value for money or contingency plans?
- The grant from Homes
England and would this be recouped from S106 contributions and the
fund retained by the Council for further potential infrastructure
projects. Would these funds be ring fenced for infrastructure that
would benefit Cullompton?
RESOLVED
that:
- The entry into an
updated Grant Funding Agreement with Homes England to secure
£33.5 million of Housing Infrastructure Fund monies and grant
delegated authority to the Director of Place and Economy in
consultation with the Section 151 Officer and Director of Legal,
People and Governance to finalise and sign the agreements in
consultation with the Cabinet Member for Governance, Finance and
Risk and Cabinet Member for Planning and Economic Regeneration be
APPROVED
- The entry in to an
updated Agreement with Devon County Council (as Delivery Partner)
to enable delivery of the Relief Road by the County Council as
Highways Authority, in consultation with the Cabinet Member for
Governance, Finance and Risk and Cabinet Member for Planning and
Economic Regeneration be APPROVED
- The use of Homes
England Capacity Funding (£109,150) to support work streams
during this financial year (2024/25) be APPROVED
- To grant delegated
authority to the Director of Place and Economy in consultation with
the Section 151 Officer and Director of Legal, People and
Governance to enter into any subsequent legal agreements should
they become necessary to facilitate the completion of the project
and in consultation with the Cabinet Member for Governance, Finance
and Risk and Cabinet Member for Planning and Economic Regeneration
be APPROVED
(Proposed by Cllr S Keable and
seconded by Cllr J Buczkowski)
Reason for decision: As stated
in the report
Note: * Report previously
circulated.
Decision Maker: Cabinet
Made at meeting: 12/11/2024 - Cabinet
Decision published: 22/11/2024
Effective from: 12/11/2024
Decision:
The Cabinet had before it a
report * from the Director of Place and Economy on the Tiverton
Eastern Urban Extension, Area B Masterplan.
The Cabinet Member for Planning
and Economic Regeneration outlined the contents of the report with
particular reference to the following:
- The Tiverton Eastern
Urban Extension (EUE) was a 153ha site, allocated for development,
to the east of Tiverton. It already benefited from an adopted
Tiverton EUE Masterplan Supplementary Planning Document but this
Masterplan did not cover the whole of the site in detail due to the
absence of some site-wide survey work on land to the rear of
properties on the southern side of Post Hill. This area of land was
now known as Area B.
- The Local Plan
reviews required the completion of a masterplan for Area B ahead of
a planning application on the area. Recently, West County Land had
been proactively working with the Area B allocation land and
considered the future form of development in relation to this land.
This had resulted in the Stage 1 consultation material available
within the reports pack, produced in consultation with the
Council.
- The consultation
material set out some emerging ideas for Area B including some
particular points that the public would be consulted
on.
- Those included: a new
point of access from Post Hill including changed prioritisation of
traffic; the location for the formal sports included on the
southern side of the former railway line; up to 10 units being
served off Mayfair; and a street
pattern for the main through route being more traditional
(informal) in layout and design.
- The public
consultation would commence on the 20 November 2024 through to 10
January 2025.
Discussion took place
regarding:
- The earlier plans and
the concerns of the size of the schools and any clarity on the
purposed site and that it would meet national
standards.
- The turning at the
top of Post Hill and the rationale behind this.
- The problems that may
occur in regards to Area B.
- The concerns
regarding the Mayfair through road and the access to 10 properties
as previously the Council had a commitment that there would be no
vehicle access.
- The traffic calming
methods that were currently in Blundell’s Road and the
calming methods that were proposed.
- Would Ward Members
and those interested be offered a site visit to examine the
area?
RESOLVED
that:
- The Tiverton EUE Area
B public consultation materials (Appendix A) for a Stage 1 public
consultation be APPROVED.
- That delegated
approval was given to the Director of Place and Economy, in
conjunction with the Cabinet Member for Planning and Economic
Regeneration, to make or approve any minor amendments to the
consultation materials.
(Proposed by Cllr S Keable and
seconded by Cllr G DuChesne)
Reason for decision: As stated
in the report
Note: * Report previously
circulated.
Decision Maker: Cabinet
Made at meeting: 12/11/2024 - Cabinet
Decision published: 22/11/2024
Effective from: 12/11/2024
Decision:
The Cabinet had before it a
report * from the Director of Place and Economy on the Mid Devon
Gypsy and Traveller accommodation assessment report.
The Cabinet Member for Planning
and Economic Regeneration outlined the contents of the report with
particular reference to the following:
- The number of pitches
that were needed to provide permanent new homes for gypsies and
travellers and plots to provide permanent new homes for travelling
showpeople in the period 2023 to 2045.
- The interim targets
were needed for development management purposes and would provide
the basis for 5 year supply calculations. Those targets would also
be included in the new local plan for the Council.
- The National Planning
Policy required the Council to undertake an assessment of the
housing needs for different groups in the community. This included
the housing needs of gypsies, travellers and travelling
showpeople.
- The assessment of the
housing need provided technical information that could be used to
help inform the preparation of the development plans and other
plans, programmes and strategies, and also the determination of
planning applications.
- A new Gypsy and
Traveller Accommodation Assessment for Mid Devon had been
undertaken by consultants “Opinion Research Services”
and the final report was completed in September 2024. Similar
studies had also been completed for Teignbridge District Council,
Exeter City Council and East Devon District Council. The assessment
replaced the previous assessment that was completed in 2015 and the
findings of that study.
- The interim targets
included the provision for: households that met the national
planning definitions for gypsies, travellers and travelling
showpeople; Households whose status was ‘undetermined’
(those who were unable to be interviewed), and also households that
had not currently met the national planning
definitions.
- This approach ensured
that all the identified housing needs of the travelling community
in Mid Devon were taken into consideration and would be planned
for. It would provide headroom to mitigate where sites with
planning permission may not come forward. Crucially, it would help
ensure the Council met the duties of the Equalities Act 2010 and
Housing Acts of 1985 and 2016.
- The assessment
provided a forecast of housing needs based on travelling households
who were residing on established sites in Mid Devon at the time of
the survey. The household interviews undertaken for the assessment
had identified no households living in other local authorities with
a need to move to a site in Mid Devon.
- The Cabinet would
note that the assessment had been unable to recommend targets for
transit sites. This was due to the absence of detailed and
consistent data that would be required through the monitoring of
encampments across local authority areas. Officers would be
investigating with colleagues from other local planning authorities
on how to move forward.
- The recommendations
included in the report had been considered and endorsed by the
Planning Policy Advisory Group.
Discussion took place
regarding:
- The Gypsy Traveller
Accommodation Assessment had not been able to make recommendations
about the need for the provision of transit sites in Mid Devon and
the working progress of this.
- When visitors came to
transit sites they would bring their own accommodation for a short
time.
- More data in regards
to transit sites to be provided at a later stage.
RESOLVED
that:
- The contents of this
report and the Mid Devon Gypsy and Traveller
Accommodation Assessment (Appendix 2) be NOTED.
- The recommended
interim targets included in Table 1 and Table 2 of this report to
help guide decisions taken on planning applications for pitches to
provide homes for gypsies and travellers and plots to provide homes
for travelling showpeople be APPROVED.
(Proposed by Cllr S Keable and
seconded by Cllr G DuChesne)
Reason for decision: As stated
in the report
Note: * Report previously
circulated.
Decision Maker: Cabinet
Made at meeting: 12/11/2024 - Cabinet
Decision published: 22/11/2024
Effective from: 12/11/2024
Decision:
The
Cabinet had before it, and NOTED, the Notification of
Key Decisions *.
The
Clerk identified the changes that had been made to the list since
it was published with the agenda. This included the
following:
- The
Housing Rents had been added to 10 December 2024
meeting.
- The
Investment in Community Land Trust projects using Devolution
funding had been added to 7 January 2025 meeting.
Note: * Key Decisions report previously circulated.
Decision Maker: Cabinet
Made at meeting: 12/11/2024 - Cabinet
Decision published: 22/11/2024
Effective from: 12/11/2024
Decision:
The minutes of the previous
meeting held on 15 October 2024 were APPROVED as a
correct record and SIGNED by the Deputy
Leader.