To consider the outcome of the tender for the
project
The Cabinet had before it a *report of the Group Manager for Corporate Property and Commercial Assets providing a review of the tender exercise for essential maintenance work at Lords Meadow Leisure Centre and to award the JCT Intermediate Building Contract with Contractors Design 2016 to two contractors.
The Cabinet Member for Housing and Property Services outlined the contents of the report explaining the work that needed to take place with regard to the replacement of the pool filters and the essential maintenance that was required. Both projects would take place simultaneously over the Christmas period.
Consideration was given to planned works and the timing of the closure of the pool area.
RESOLVED the JCT Intermediate Building Contract with Contractors Design 2016 building contracts for essential planned maintenance works to two pool filters and the repair and upgrade to the fabric of both swimming pools at Lords Meadow Leisure Centre be awarded to supplier C for Lot 1 and supplier B for Lot 2.
(Proposed by the Chairman)
Note: *Report previously circulated, copy attached to minutes.
Report author: Andrew Busby
Publication date: 22/10/2019
Date of decision: 17/10/2019
Decided at meeting: 17/10/2019 - Cabinet
Effective from: 26/10/2019