83 Tiverton Eastern Urban Extension, Area B Masterplan PDF 280 KB
To receive a report from the
Director of Place and Economy on the Tiverton Eastern Urban
Extension, Area B Masterplan.
Additional documents:
Minutes:
The Cabinet had before it a
report * from the Director of Place and Economy on the Tiverton
Eastern Urban Extension, Area B Masterplan.
The Cabinet Member for Planning
and Economic Regeneration outlined the contents of the report with
particular reference to the following:
- The Tiverton Eastern
Urban Extension (EUE) was a 153ha site, allocated for development,
to the east of Tiverton. It already benefited from an adopted
Tiverton EUE Masterplan Supplementary Planning Document but this
Masterplan did not cover the whole of the site in detail due to the
absence of some site-wide survey work on land to the rear of
properties on the southern side of Post Hill. This area of land was
now known as Area B.
- The Local Plan
reviews required the completion of a masterplan for Area B ahead of
a planning application on the area. Recently, West County Land had
been proactively working with the Area B allocation land and
considered the future form of development in relation to this land.
This had resulted in the Stage 1 consultation material available
within the reports pack, produced in consultation with the
Council.
- The consultation
material set out some emerging ideas for Area B including some
particular points that the public would be consulted
on.
- Those included: a new
point of access from Post Hill including changed prioritisation of
traffic; the location for the formal sports included on the
southern side of the former railway line; up to 10 units being
served off Mayfair; and a street
pattern for the main through route being more traditional
(informal) in layout and design.
- The public
consultation would commence on the 20 November 2024 through to 10
January 2025.
Discussion took place
regarding:
- The earlier plans and
the concerns of the size of the schools and any clarity on the
purposed site and that it would meet national
standards.
- The turning at the
top of Post Hill and the rationale behind this.
- The problems that may
occur in regards to Area B.
- The concerns
regarding the Mayfair through road and the access to 10 properties
as previously the Council had a commitment that there would be no
vehicle access.
- The traffic calming
methods that were currently in Blundell’s Road and the
calming methods that were proposed.
- Would Ward Members
and those interested be offered a site visit to examine the
area?
RESOLVED
that:
- The Tiverton EUE Area
B public consultation materials (Appendix A) for a Stage 1 public
consultation be APPROVED.
- That delegated
approval was given to the Director of Place and Economy, in
conjunction with the Cabinet Member for Planning and Economic
Regeneration, to make or approve any minor amendments to the
consultation materials.
(Proposed by Cllr S Keable and
seconded by Cllr G DuChesne)
Reason for decision: As stated
in the report
Note: * Report previously